Friday, 14 August 2026
Hong Kong Weather News

Local News, Hong Kong. Every Day.

Multiple Sources. Transparent Technology.

news

Causeway Bay Residents Weigh Major Pedestrian and Waterfront Works Impact

Residents consider impacts of ongoing pedestrian and waterfront works in the district.

By Causeway Bay News Desk · Published 25 July 2026

How we reported this

This article was written by AI from the linked sources and was not reviewed by a journalist before publishing. Hong Kong Weather News is part of The Daily Network and follows our reasonable editorial care.

Causeway Bay Residents Weigh Major Pedestrian and Waterfront Works Impact
Photo by foxypar4 / flickr (by)

The proposed pedestrian link project in Causeway Bay, comprising five footbridges and a 100-meter covered walkway from Hysan Place to Lee Gardens and Caroline Hill Road, is expected to open progressively from 2026 onwards. This development forms part of efforts to improve movement between key commercial sites.

Project Details and Timelines

Construction of five covered footbridges connecting Lee Garden phases and a walkway cover across Kai Chiu Road was gazetted in May 2023 to divert pedestrians from busy at-grade roads. The East Coast Boardwalk connecting Causeway Bay and Quarry Bay was fully completed, with its eastern section opened on 29 December 2025, creating a continuous 13 km promenade along Hong Kong Island's northern shore. The Revitalised Typhoon Shelter Precinct in Causeway Bay includes a new 317 m promenade near Victoria Park Road and harbour steps, originally expected to open in the latter half of 2022.

Office and Waterfront Developments

One Causeway Bay, a 24-storey Grade A waterfront office tower developed by Mandarin Oriental Hotel Group, completed its structural topping out in July 2024 and will offer 500,000 sq. ft. of office space. These elements sit alongside the pedestrian improvements and boardwalk extensions already referenced in government records.

Community members in Causeway Bay have noted how the sequence of these works affects daily travel patterns near Hysan Place, Lee Gardens, Caroline Hill Road, Kai Chiu Road and Victoria Park Road. The East Coast Boardwalk completion links directly to areas around Quarry Bay, while the Typhoon Shelter Precinct promenade adds to waterfront access.

Next Steps for Users

Further openings are scheduled progressively from 2026 for the five footbridges and 100-meter walkway. Users can monitor updates through the Development Bureau and Highways Department channels listed in the project documentation.

References Sourced but Not Limited to:

Beta · AI-assisted · human oversight

Your newsroom. Shaped by you.

Hong Kong Weather News is in beta. AI may assist with research, summarising and drafting. Automated checks assess sourcing, accuracy and editorial risk before publication, and sensitive material is held for human review. Spotted something off, or want us covering a topic? Tell us. Your feedback is entirely optional and helps shape what we publish next.